Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | china |
---|---|
Brand Name: | Eminent Tysun |
Model Number: | E2 |
Minimum Order Quantity: | 1 set |
Delivery Time: | 30 day |
Payment Terms: | L/C, T/T |
Supply Ability: | 5000 set |
E2 gangway column include ladder front ladder deck ladder rotatable platform upright post install 5000 DWT~50000 DWT Jetty
Gangway column is a kind of marine access gangway for operators and crews to pass through ship and jetty safely in the process of oil tanker's berthing at habour. It is instead of traditional boarding device.
To speed up the loading and unloading process and to ensure the safety of the loaders and crews, it is necessary to replace traditional ladder with gangway tower and gangway column.
The boarding ladder consists of a standing column, telescopic ladder and other supplementary constructions. The telescopic ladder has the function of moving up and down, bending, slewing and the adjustment of the front ladder.
Mechanical or hydraulic drive system is usually used as drive system for Gangway Tower. The hydraulic cylinder drives the main ladder and front ladder for the luffing and slewing. The slewing cylinder could be floating after connected with ship without counterweight.
Many kinds of safe protector can be set according to client’s requirement in order to ensure the normal work of transmission mechanism. Explosive-proof electric-device can also be used base on the flash point of the oil.
Inspection and acceptance test can be done by customer or well known survey company (Bureau Veritas, SGS, Lloyd's register, Det Norske Veritas etc.)
Main features:
Selection guide for Gangway Column
The selection of Gangway Column is mainly according to dock tonnage, tidal variation, jetty surface situation, cost performance, etc. Users must fill in the parameters form and submit to manufacturer for determining the envelope scope base on the dimension and load data of Gangway column.
There are 3 types of gangway: E1,E2,E3
Description | Data |
Type | |
Design ship type | max T/min T |
Dock elevation | m |
Design /extreme high water level | m / m |
Design/ extreme low water level | m / m |
Distance between edge of jetty and center of Gangway Tower | m |
Thickness of dock fender | m |
Distance between datum surface of tower bottom base and dock surface | m |
Site power | 380v 50Hz 3phases 5lines |
Explosive-proof grade | |
Control mode | |
Maximum design wind speed | m/s |
If you want to know
(Manually operated marine loading arms) please click http://www.oilgas-equip.com/sale-12406664-manual-operated-marine-loading-arm-for-5-000-tons-300-000-tons-ship-adjustable-support-jack-drain-co.html
(Electric-hydraulically powered marine loading arms Single pipeline)please click http://www.oilgas-equip.com/sale-12406727-electric-hydraulic-operated-marine-loading-arm-single-pipeline-sound-and-light-alarm-swivel-joint-el.html
(Electric-hydraulically powered marine loading arms Double pipelines)please click http://www.oilgas-equip.com/sale-12447226-electric-hydraulically-powered-marine-loading-arms-double-pipelines-transit-lpg-ammonia-dangerous-me.html
(LNG and cryogenic marine loading arm) please click http://www.oilgas-equip.com/sale-12447230-lng-and-cryogenic-marine-loading-arm-operable-in-temperatures-196-c-delivery-pressures-45-bar.html
(Tank truck & Railcar Top loading arms single pipeline) please click http://www.oilgas-equip.com/supplier-375641-tank-truck-railcar-top-loading-arms-single-pipeline
(Top loading arm with vapour return pipeline) please click http://www.oilgas-equip.com/supplier-375640-top-loading-arm-with-vapour-return-pipeline
(Tank truck & Railcar Bottom loading arms with single pipeline) please click http://www.oilgas-equip.com/supplier-375643-tank-truck-railcar-bottom-loading-arms-with-single-pipeline
(Bottom loading arm with vapour return pipeline) please click http://www.oilgas-equip.com/supplier-376895-bottom-loading-arm-with-vapour-return-pipeline
(LNG Tank truck loading arms) please click http://www.oilgas-equip.com/sale-12358045-lng-tank-truck-cryogenic-loading-arms-nitrogen-purging-system-swivel-joints-international-cryogenic.html
(Laser dock monitoring system) please click http://www.oilgas-equip.com/sale-12514598-laser-dock-monitoring-system-ldms-and-environment-monitoring-system-and-mooring-load-monitoring-syst.html
(Skid mounted metering loading/unloading system) please click http://www.oilgas-equip.com/sale-12460261-lpg-skid-mounted-metering-unlading-control-system.html
(LNG skid mounted metering system) please click http://www.oilgas-equip.com/sale-12462403-cryogenic-lng-skid-mounted-land-loading-measuring-system.html
(Gangway tower) please click http://www.oilgas-equip.com/sale-12413414-e4-gangway-large-heavy-duty-tower-include-main-ladder-rotatable-platform-lifting-mechanism-20000dwt-.html
(Gangway column) please click http://www.oilgas-equip.com/supplier-376891-gangway-column
(Jib crane) please click http://www.oilgas-equip.com/sale-12424139-jib-crane-is-liquid-petrochemical-wharf-project-this-fixed-hydraulic-explosion-proof-crane-0-5t-to-3.html
(Quick release mooring hook) please click http://www.oilgas-equip.com/sale-12465644-quick-release-mooring-hook-remote-release-system-intelligent-towing-hook-release-mechanism.html